Construction Project Controls · Los Angeles, CA

On Time.
On Record.
Every Time.

HADVEN delivers CPM scheduling, BIM coordination, and forensic delay analysis that keep federal, DOT, and public works projects on time, on budget, and on record.

CPM Scheduling

Primavera P6 schedules built for agency review and audit.

BIM Coordination

Clash detection and model federation before conflicts reach the field.

Forensic Delay Analysis

TIA and EOT claims supported by defensible methodology.

What Contractors and Owners Expect and Actually Get

Every CPM schedule HADVEN produces is built to survive owner review, agency audit, and, if necessary, legal scrutiny.

Start a Conversation

Schedules built to USACE QCS/RMS, Caltrans, and Port Authority reporting requirements

EOT and TIA claims prepared using industry-standard forensic methodology

BIM coordination that resolves multi-trade conflicts before they reach the field

Full-cycle support from tender scheduling through final as-built and closeout

Direct experience with federal military, aviation, highway, healthcare, and international programs

Response to all project inquiries within one business day

What We Do

HADVEN is a construction consulting firm built around one discipline: project controls. From baseline CPM scheduling through forensic delay claims, we support general contractors, subcontractors, and public agencies at every stage of the schedule — including federal, DOT, and VA construction scheduling assignments where the reporting bar is highest.

CPM Scheduling & Primavera P6

Baseline schedules, monthly updates, resource loading, cost loading, and recovery plans built in Primavera P6 to USACE, Caltrans, DOT, and Port Authority reporting standards.

Explore CPM Services

BIM Coordination & Modeling

Multi-trade BIM modeling, Navisworks clash detection, shop drawing coordination, and 4D scheduling to eliminate field conflicts before construction begins.

Explore BIM Services

Forensic Delay Analysis

Reconstruction of the project record, quantification of delay impacts, and preparation of EOT and TIA claims that hold up in owner negotiations and legal proceedings.

Learn More

Time Impact Analysis (TIA)

Quantify the schedule impact of a specific delay event by inserting it into the accepted CPM logic and measuring the effect on project completion.

Learn More

Extension of Time (EOT) Claims

Entitlement documentation and supporting schedule analysis for EOT claims prepared to standards accepted by public agencies and federal authorities.

Learn More

Recovery Scheduling

Recovery plans and mitigation schedules that identify critical-path activities and restore project timelines after delay or disruption.

Learn More
View All Services

A Proven Process for Project Controls Success

Every engagement follows the same disciplined sequence — from initial scope review through final closeout documentation.

01

Understand

We review contract documents, specifications, and reporting requirements before writing a single activity.

02

Plan

We select the right methodology and tools — Primavera P6, BIM coordination, or forensic analysis.

03

Build

We develop the baseline schedule, federated model, or delay analysis with full supporting logic.

04

Review

Every deliverable is checked against agency standards before it reaches your desk or the owner's.

05

Monitor

We track progress, update schedules, and flag emerging risks before they become disputes.

06

Deliver

Final documentation is packaged to withstand agency audit, owner review, or legal scrutiny.

Selected Project Experience

A representative sample of assignments across federal, fire & safety, and infrastructure programs in California.

GovernmentCalifornia

Vehicle Maintenance Shop — Bakersfield

California National Guard (CAARNG) Bakersfield, CA

24,564 sq ft National Guard Vehicle Maintenance Shop. Precise sequencing of specialized mechanical, electrical, and structural systems under USACE compliance standards.

CPM Baseline ScheduleMonthly Updates
Federal InfrastructureCalifornia

R.L. Schafer Dam / Success Lake HQ

US Army Corps of Engineers — Sacramento District Porterville, CA

New 9,950 sq ft USACE Headquarters and 3,200 sq ft maintenance shop. Full USACE QCS/RMS integration with cost and resource loading reconciled to total contract value.

CPM Baseline ScheduleMonthly Updates
Fire & SafetyCalifornia

Chino Valley Fire Station Chino Valley, CA

Chino Valley Fire District · California Public Works Chino Valley, CA

12,901 sq ft primary fire station and 6,345 sq ft apparatus storage built to essential facility standards. As-built documentation prepared for state agency closeout.

CPM Baseline ScheduleMonthly Updates
View All Projects

Sectors We Work In

CPM scheduling and BIM requirements differ across sectors. HADVEN's professionals have direct project experience in each of the following.

Aviation

Federal & Military

Highway & Transportation

Healthcare

International Programs

Public Works

Ready to Protect Your Project?

Engage HADVEN for CPM scheduling, BIM coordination, or forensic delay analysis. We respond to all inquiries within one business day.