HADVEN is a construction scheduling consultant and project controls firm delivering CPM scheduling, BIM coordination, and forensic schedule analysis that keep federal, DOT, and public works projects on time, on budget, and on record.
Primavera P6 schedules built for agency review and audit.
Clash detection and model federation before conflicts reach the field.
TIA and EOT claims supported by defensible methodology.
Every CPM schedule HADVEN produces is built to survive owner review, agency audit, and, if necessary, legal scrutiny.
Schedules built to USACE QCS/RMS, Caltrans, and Port Authority reporting requirements
EOT and TIA claims prepared using industry-standard forensic methodology
BIM coordination that resolves multi-trade conflicts before they reach the field
Full-cycle support from tender scheduling through final as-built and closeout
Direct experience with federal military, aviation, highway, healthcare, and international programs
Response to all project inquiries within one business day
HADVEN is a construction consulting firm built around one discipline: project controls. As a full-service construction scheduling consultant and construction claims consultant, we support general contractors, subcontractors, and public agencies from baseline CPM scheduling and schedule risk analysis through forensic delay claims — including federal, DOT, and VA construction scheduling assignments where the reporting bar is highest.
Baseline schedules, monthly updates, resource loading, cost loading, schedule risk analysis, and recovery plans built in Primavera P6 to USACE, Caltrans, DOT, and Port Authority reporting standards.
Explore CPM ServicesMulti-trade BIM modeling, Navisworks clash detection, shop drawing coordination, and 4D scheduling to eliminate field conflicts before construction begins.
Explore BIM ServicesForensic schedule analysis and construction claims consulting: reconstruction of the project record, quantification of delay impacts, and preparation of EOT and TIA claims that hold up in owner negotiations and legal proceedings.
Learn MoreQuantify the schedule impact of a specific delay event by inserting it into the accepted CPM logic and measuring the effect on project completion.
Learn MoreEntitlement documentation and supporting schedule analysis for EOT claims prepared to standards accepted by public agencies and federal authorities.
Learn MoreRecovery plans and mitigation schedules that identify critical-path activities and restore project timelines after delay or disruption.
Learn MoreEvery engagement follows the same disciplined sequence — from initial scope review through final closeout documentation.
We review contract documents, specifications, and reporting requirements before writing a single activity.
We select the right methodology and tools — Primavera P6, BIM coordination, or forensic analysis.
We develop the baseline schedule, federated model, or delay analysis with full supporting logic.
Every deliverable is checked against agency standards before it reaches your desk or the owner's.
We track progress, update schedules, and flag emerging risks before they become disputes.
Final documentation is packaged to withstand agency audit, owner review, or legal scrutiny.
A representative sample of assignments across federal, fire & safety, and infrastructure programs in California.
24,564 sq ft National Guard Vehicle Maintenance Shop. Precise sequencing of specialized mechanical, electrical, and structural systems under USACE compliance standards.
New 9,950 sq ft USACE Headquarters and 3,200 sq ft maintenance shop. Full USACE QCS/RMS integration with cost and resource loading reconciled to total contract value.
12,901 sq ft primary fire station and 6,345 sq ft apparatus storage built to essential facility standards. As-built documentation prepared for state agency closeout.
CPM scheduling and BIM requirements differ across sectors. HADVEN's professionals have direct project experience in each of the following.
CPM (Critical Path Method) scheduling is the industry-standard technique for planning and managing construction project timelines. HADVEN develops CPM schedules using Primavera P6 for federal agencies, public authorities, and general contractors.
Cost depends on project size, schedule complexity, and reporting requirements such as USACE QCS/RMS or Caltrans standards. HADVEN provides a fixed-fee quote after reviewing project contract documents and specifications — request a quote for project-specific pricing.
A Time Impact Analysis (TIA) is a forensic scheduling method that quantifies the delay caused by a specific event — such as an RFI, change order, or owner-caused disruption — by inserting it into the accepted CPM schedule and measuring the resulting impact on project completion.
An Extension of Time (EOT) claim is a formal request by a contractor for additional contract time due to owner-caused or excusable delays. HADVEN prepares EOT claims including schedule analysis, entitlement documentation, and supporting data accepted by public agencies and federal authorities.
Project controls is the discipline of planning, monitoring, and managing a project's schedule, cost, and risk from baseline through closeout. HADVEN's project controls services include CPM scheduling, resource and cost loading, schedule risk analysis, and monthly progress reporting.
HADVEN provides BIM coordination, multi-trade clash detection using Navisworks, MEP modeling in Revit, shop drawings, 4D scheduling, and as-built BIM documentation for construction projects.
Contact HADVEN at +1 323-305-5054 or projects@hadven.com. Office: 3680 Wilshire Blvd Ste P04 #A139, Los Angeles, CA 90010. HADVEN responds to all project inquiries within one business day.
Engage HADVEN for CPM scheduling, BIM coordination, or forensic delay analysis. We respond to all inquiries within one business day.